Demolition Plan & Safe Work Method Statements (SWMS)

All subcontractors in consultation with principal contractor are to prepare Safe Work Method Statements in compliance with WH&S Legislation & principal contractor’s Safety Management Plan prior to starting work at the workplace. If at any time a change in workplace conditions arise a review of that SWMS shall be considered by the supervisor.

This Safe Work Method Statement shall contain how you intend to carry out the work and what safety systems you are going to adopt to achieve the required level of safety. Any changes shall be recorded on the SWMS. Any changes shall be communicated to all workers.

A copy of the subcontractor’s and principal contractor safety plans are to be kept on site and made available for perusal by all workers at any reasonable time.

All subcontractors shall submit their Safe Work Method Statements to principal contractor prior to commencing work on site. They shall be attached to the Safety Management Plan and kept at the workplace at all times.

View the video click the link below:

Complete the form click the link below:

Form – F29. Demolition control plan
Form – F33. SWMS for a high-risk construction task

To view a typical Safe Operating Procedure click the link below:

SOP – Demolition – Removal of Glass
SOP – Demolition – Removal of Fixtures
SOP – Demolition – Removal of Redundant Ductwork
SOP – Demolition – Removal of Redundant Insulation
SOP – Trade work On Ground

SOP – Trade Work Overhead

To view a typical Hazard analysis click the link below:

Hazard – Demolition