CPCCDE3014<br>Remove non-friable asbestos
Introducing “Asbestos”
Prepare for Asbestos Removal
8 Topics
Obtain work instructions and participate in review of asbestos removal control plan (ARCP) and safe work method statements (SWMS).
Gather safety requirements and data from an on-site assessment and asbestos register where available.
Use information sources to ensure the ARCP and SWMS are site-specific for the removal of asbestos materials.
Select tools, equipment, and personal protective equipment (PPE) consistent with job requirements to carry out tasks, check for serviceability, and rectify or report faults prior to commencement.
Notify regulator, occupants, neighbours, and other affected parties according to legislation and within limits of own responsibility and code of practice.
Contribute to the preparation and use of an emergency plan, within limits of own responsibility and according to legislative and company requirements.
Emergency response and evacuation procedures are known, practised, and carried out effectively when required.
Contribute to processes required to undertake air monitoring and to meet health monitoring requirements in line with level of authority and responsibility and regulatory requirements.
Prepare Asbestos Removal Site
3 Topics
Identify location of non-friable asbestos materials and confirm with supervisor location of site boundaries.
Implement signage and barricade requirements to delineate the asbestos removal site according to ARCP.
Prepare and place materials and equipment required for removal of ACM from site.
Set Up Asbestos Work Area
4 Topics
Designate boundaries of asbestos work area according to ARCP requirements.
Set up decontamination according to ARCP.
Set up asbestos waste storage and waste transit route according to ARCP.
Undertake processes to ensure the safety of the site, including deactivating or securing utilities where necessary prior to commencing work.
Remove Non-Friable Asbestos.
4 Topics
Fit-check respiratory protective equipment (RPE) and fit PPE.
Wet down or spray work area with particle binder.
Carry out asbestos removal ensuring airborne asbestos fibres are kept to a minimum (i.e. appropriate tools, wet removal, minimise breakage, good handling techniques).
Contain, wrap, or otherwise seal the wet asbestos, place into removal bags or bins, seal, and label according to ARCP.
Carry Out Decontamination Process.
2 Topics
Carry out decontamination of the work area and tools according to ARCP.
Carry out personal decontamination according to ARCP.
Clean Up Work Area.
3 Topics
Remove asbestos waste materials and equipment from the area according to ARCP.
Store tools, plant, and equipment according to manufacturer recommendations and regulatory requirements to ensure site is ready for clearance inspection.
Take steps to ensure clearance inspection requirements are met, within the limits of own responsibility and to ensure clearance certificate is gained from a competent person or licensed asbestos assessor.
Complete Regulatory Processes
3 Topics
Ensure clearance inspection is undertaken prior to removing signage, plant, and equipment.
Contribute to the preparation and use of documentation for regulatory notification processes, within limits of own responsibility and according to legislative and company requirements.
Provide stakeholders with clearance inspection certificate prior to reoccupation, as required.
Previous Lesson
Next Lesson
Set Up Asbestos Work Area
CPCCDE3014Remove non-friable asbestos
Set Up Asbestos Work Area
Lesson Content
0% Complete
0/4 Steps
Designate boundaries of asbestos work area according to ARCP requirements.
Set up decontamination according to ARCP.
Set up asbestos waste storage and waste transit route according to ARCP.
Undertake processes to ensure the safety of the site, including deactivating or securing utilities where necessary prior to commencing work.