Everyone is responsible for his or her own personal rubbish, food scraps, drink containers, newspapers, and the like, which also must be placed in the bins provided.
• Lunchrooms shall be cleaned on a regular basis, but workers/users are required to clean up their own mess and dispose in the waste receptacles provided
• At commencement of project a waste skip shall be provided for all material waste, and this shall be located as appropriate to task
• Other skips shall be provided to site during construction phase and placed at appropriate positions as determined by the site manager – All skips shall be replaced by contractor when each skip is full
• Other rubbish shall be cleaned up to site by bobcat and trucked out at that time
These practices shall be visually monitored by the Site Supervisor on a daily basis to ensure that systems put in place are effective and that subcontractors are following directions given for disposing of rubbish, no written evidence is required.
Access to site and other access ways shall be kept free of materials and rubbish at all times to prevent the risk of injury from tripping or other hazards. Access ways also refer to scaffold decks, which shall be kept free from rubbish and materials at all times.
Subcontractors are advised that they have obligations imposed on them under the WH&S regulation and that each PCBU must ensure their workers are instructed to follow the practices outlined.