F43. Scaffold / Formwork Inspection TP - Scaffold / Formwork ChecklistAbbreviationsCompliant C Improvement Possible IMP Non-Compliant NCR Not Applicable N/ASITE LOCATIONITEMSIs the approved scaffold drawing on site?VerifiedHave sufficient safeguards against electric power lines been provided?VerifiedIs there sufficient control over plant & vehicle movement?VerifiedDoes the supporting structure have adequate strength? VerifiedIs the supporting structure in good condition? VerifiedAre soleplates of suitable material and in a serviceable condition? VerifiedAre Uprights bearing firmly and plumb? VerifiedIs the bracing adequate / sufficiently stable?VerifiedAre ties correctly positioned and correctly fixed? VerifiedAre planks secured against wind?VerifiedIs there adequate access and egress to platforms?VerifiedHas the structure been designed for wind loading on any containment sheeting?VerifiedAre the clearances between the structure and adjacent structures correct?VerifiedIs there adequate provision for material handling?VerifiedTOTALVerified