1 Introduction

1.1 Purpose
The purpose of this Quality Design Plan (QDP) is to provide a methodical approach to the management of the design process and identify the procedures and systems for control of the design output
1.2 Document Control
The QDP is a controlled document. All unauthorised copies either electronic or printed are considered uncontrolled copies. Copyholders and the version numbers will be recorded in the distribution record.
1.2.1 Amendment Record
DD slash MM slash YYYY
Amendment Record
Rev. #
Date
Details(Section #)
Details(Para. #)
Description of Changes
Approved By
 
1.3 Review and Approval
This Project Quality Management Plan will undertake a continual review, and any changes to the plan will be managed by the project's procedure.

1.3.1 Quality Design Plan Review and Approval

Configuration Required
Use the Nested Form and Summary Fields settings to choose the form and fields to display in this Nested Form field.

1.4 Scope
This Quality Design Plan comprises (insert output product and/or service)

2 Key Individuals

3 Key Personnel Responsibilities and Accountabilities

Quality Manager ensures that the deliverables of the project are fit for purpose, is consistent and meets both external and internal requirements. The role includes responsibility for:
  • Assist in devising and establishing the project's design specifications;
  • Review project requirements and makes sure they are met;
  • Establish and maintain control and documentation procedures;
  • Monitor performance by gathering relevant data and produce reports;
  • Make suggestions for changes and improvements and how to implement them;
  • Check all documents for compliance;
  • Manage reported deviations from the design plan, either by ensuring that the design plan is followed, or through a Change Request adapting the Plan to better reflect the reality of the project;
  • Develop, in consultation with the Project Manager, corrective actions when appropriate;
  • Ensure planned corrective actions have been completed.
Team Leaders
  • Review design documentation;
  • Facilitate design changes;
  • Keep the Project Manager and QC Manager informed of project progress and any changes in requirements;
  • Coordinate all requirements with the Project Manager and QC Reviewer
Team Members
  • Prepare design documentation;
  • Participate in consultative arrangements;
  • Coordinate information

4 Milestones

Milestones 1
Pre- scoping
Project manager receives and reviews the pre scoping document and determines that needs have been addressed
DD slash MM slash YYYY
Milestones 2
Scoping
Project manager receives and reviews the scoping document and approves
DD slash MM slash YYYY
Milestones 3
Preliminary design
DD slash MM slash YYYY
Milestones 4
Final Design
DD slash MM slash YYYY
Milestones 5
Post award and commencement
DD slash MM slash YYYY

Configuration Required
Use the Nested Form and Summary Fields settings to choose the form and fields to display in this Nested Form field.

6 Verification and Validation

List
Verification
Validation
Phase
Timing
Responsibility
 
Verification (Draft Engineering plans(Consultant A for X project)) Validation(Complete set of drawing(as per contract)) Phase(design) Timing(Start of Project) Responsibility(Team member A)

7 Design Approval

I verify that all required components have been completed and the Design is ready for release.
Clear Signature
DD slash MM slash YYYY
Drop files here or