Gather safety requirements and data from an on-site assessment and asbestos register where available.

Listen to this Topic

SWMS, WH&S Management Plans
Safety plans shall be prepared by the supervisor in consultation with workers, Principal Contractor, and other stakeholders to ensure all activities are managed safely. The processes identified in these documents shall be communicated to all workers and the workers indicate their understanding of these requirements by counter-signing the documents.

View the Safe operating Procedures (SOP) and the completed Risk Assessment in the Hazard Register (Hazards) and forms at the end of this Course .

Watch the videos below:

To view a typical Hazard analysis  click the link below:

Hazard – Recurring Hazards

Asbestos register

Management of in situ asbestos containing material is based on its assessed level of risk:

• Maintenance of the registers of asbestos containing material to record all changes in the status of confirmed or presumed asbestos containing material and works undertaken in areas where asbestos containing material has been confirmed, or is presumed, to exist.
• Removal of asbestos containing material based on its assessed level of risk.
• Removal of any identified high risk and/or friable asbestos containing material in a poor condition as an immediate priority.