All vehicles, mobile and fixed plant are provided with Daily Pre-Start Inspection checklists.
It is the operator’s responsibility each day before using a «T vehicle or item of mobile plant, to inspect the vehicle or plant using the Pre-Start Inspection checklist to identify if it is safe for daily operation.
These inspections must be done at the beginning of the shift prior to the plant or equipment being released into production. Any problems identified must be reported to Supervisor so they can be repaired